K4 a.s. developed the concept for the construction of a new manufacturing complex in the Sochorova Vyškov industrial zone. A total of 5 new halls, uncompromisingly placed on a rather dramatic terrain, along with administrative and social facilities. Currently, the 1st phase is being implemented, and the second phase is in progress. The original concept of the administrative part has been significantly altered due to the investor's interventions, and the original VELUX red color of the second floor of the administrative block has been changed to a muted sand color. However, the generous concept of the manufacturing halls has been preserved with a contrast between the opposing glass and concrete walls and a clean solution for the interiors.
The English translation is powered by AI tool. Switch to Czech to view the original text source.