Brno Business Park – Phase III

Brno Business Park – Phase III
Collaboration:Eliška Havlíková, Marek Starý
Address: Londýnské náměstí, Štýřice, Brno, Czech Republic
Investor:Brno Business Park a.s.
Project:2016-20
Completion:2020-22




The building is located in a very visually prominent place on the access road from Vienna and simultaneously on the exit from Brno. The object completes the Brno Business Park area, which was finished in 2004. The newly constructed building closes the existing four business center structures and becomes their domain. It is a standalone building composed of two parts: a lower eight-story section and a twelve-story tower, which has a technical room located on the roof of the twelfth above-ground floor (on the 13th floor). The ground floor of the building will serve commercial units, the above-ground floors will be for office spaces, and two underground floors are reserved for parking and technical rooms.
The building meets all the requirements of today's times. It is full of modern technologies, including sophisticated elevators that respond to the entry of people who work in the building, complete control of the lighting throughout the facility, the building is monitored, and everything can be controlled based on requests. The object will be certified in LEED (LEED is a certification system for quality and sustainability), from which these requirements emerged: very high-quality glazing of the object with high light transmittance and low thermal gain, a relaxation zone for team activities of tenants, a bicycle storage room with hygiene facilities, a lounge terrace, use of rainwater, charging stations for electric cars. The object also responds to today's complex times regarding energy and is prepared for blackouts with 100% backup for high tenant comfort.
The English translation is powered by AI tool. Switch to Czech to view the original text source.
0 comments
add comment

more buildings from K4 a.s.