Zprávy

Novinky

0 08:10 | Nomination for the J. M. Olbrich Award for Reconstruction in the years 2023-2024
0 yesterday | The Property Office sold the former headquarters of the Institute for the Study of Totalitarian Regimes (ÚSTR) in Prague's Žižkov district for 387 million crowns
0 yesterday | Workers will begin the reconstruction of the swimming pool in Prague's Motol, the season will not be affected by the work
1 02.07. | The exhibition commemorates the significant architect of interwar Plzeň, Hanuš Zápal
0 02.07. | Jablonec nad Nisou is preparing a competition for the construction of a transport terminal
0 02.07. | In Nové Město nad Metují, the construction of an outdoor swimming pool begins for 92 million CZK
0 02.07. | The exhibition pavilion from 1931 in Lázně Bohdaneč could come to life as a gallery
0 02.07. | In the center of Zlín, the demolition of the former bank building has begun; a high-rise building will be constructed on the site
0 02.07. | The ÚOHS confirmed the exclusion of PVM from the tender for the second section of the metro D, an appeal can be filed
0 02.07. | At noon, the auction of the former ÚSTR residence in Prague's Žižkov district begins
0 01.07. | <UOHS> prohibited <TSK> from repairing the <Libeň Bridge> according to the revised proposal
0 01.07. | New bathroom showroom in Prague: endless inspiration, over a thousand displayed samples, and bathroom designs right on site
0 01.07. | Phenomenal success of Berker switches at the ARCHITECT@WORK fair
0 01.07. | The project documentation for the Třebíč LDN will cost 14 million crowns
0 01.07. | The work on completing the renovation of the square in Brno-Bosonohy will begin during the holidays
0 30.06. | People active in culture can apply for artist status with state support
0 30.06. | Pardubice Innovation Center will probably be lower, the region will comply with residents' complaints
0 30.06. | Jičín will sell the first plots for houses in the barracks through a bidding process, the rest through auction
0 30.06. | The reconstruction of Zelenka's villa in Kutná Hora will be extended by two months
0 30.06. | We aspire to perfection, unafraid to challenge it time and again. Architects from Master Design on designing homes with a story.