Winter spa on the boat

Winter spa on the boat
Address: Eichenstrasse 4, Berlin, Germany
Investor:Kulturarena Veranstaltungs GmbH
Completion:2005
Built Up Area:750 m2
Built Up Space:2400 m3


The first drop of clean water in the Spree: In the middle of the Berlin East Harbour (Oshafen), a reconstructed old cargo ship is being used as a public swimming pool. To make it usable year-round, the entire facility is temporarily covered in winter months. The structure consists of elliptical wooden trusses that are covered with a double-layer membrane. Translucent and transparent surfaces in selected areas create a strong cover for the outdoor space. The space between the membranes is filled with compressed air to achieve optimal sealing of the entire facility with minimal self-weight. To keep construction costs as low as possible, only standard materials were used. Great emphasis was placed on simple connectors and manual assembly to allow for quick assembly and disassembly of the structure.

Project collaborators: Thomas Freiwald, Catharine von Eitzen, Ann Kristin Hase, Fabian Lippert, Nora Müller

Translation by Alena Rádyová, Jana Mojžíšová (adapted from the exhibition panel Intercity: Berlin – Prague)
The English translation is powered by AI tool. Switch to Czech to view the original text source.
3 comments
add comment
Subject
Author
Date
...Vida!...
šakal
24.11.08 02:26
che,
Vích
24.11.08 09:31
co asi ceka Vltavu
A.J.K.
24.11.08 09:38
show all comments