Address: Celje, Slovenia
Investor:město Celje
Project:2005
Completion:2005
Built Up Area:200 m2
Site Area:500 m2


The Building is a part of Celje's anti-flooding infrastructure. In it two electric generators for water pumps are based. The generators' height was exceeding the maximum height allowed in the area. That is the reason for the roof's characteristic shape: it is adjusted to the form of generators to make the building as low as possible. The image of the industrial building is therefore a mere reflection of the technology situated inside. Due to the fact that the building stands in a natural environment of Savinja river, an additional metal net skin was added, once to be overgrown with green.
4 comments
add comment
Subject
Author
Date
Elektrárna nebo čerpadlo?
Beata Lenarcik
30.07.10 12:48
Elektrárna pro čerpadla.
Petr Šmídek
30.07.10 09:21
Elektrárna nebo čerpadlo?
Beata Lenarcik
30.07.10 06:31
Elektrárna asi nezaroste!
Martin Přibík
10.08.10 09:27
show all comments

more buildings from Arhitektura Krušec