Administrative building of the company Abrasive

Administrative building of the company Abrasive
Address: U Bílé haldy 1176, Rokycany, Czech Republic
Investor:Brusivo spol. s r.o.
Completion:2015


The new administrative building concludes the production hall from the north. It is a two-story reinforced concrete prefabricated skeleton with monolithic ceilings. The regular module is 4x4 in two aisles. The entire system is enclosed in a concrete block, which is interrupted by three openings. The first is for a relaxation terrace for the directors’ offices and also provides shading from the west. The second opening is in the center of the building and creates space for a winter garden. The last opening is on the eastern side. A large tree grows there.
The main northern façade is characterized by a regular rhythm of windows. It is essentially a unique façade structure which is designed as one large self-supporting window. The opening sections are flush and solid. The façade is accented by black sheet metal used as a railing and as the company logo. The main construction is made of exposed concrete, which is also applied in the interior. Panels made from ceiling formwork were used on the vertical walls to achieve the desired fine texture of wood. The prefabricated staircase is highlighted with an orange coating. The doors are metal, finished with colored paint in a certain logic. The entrance doors are black, the office doors are various colors, and the service area doors are white. Emphasis was placed on creating a pleasant work environment in the overall design. Although the building has air conditioning, each room has an opening section on the façade, plenty of natural light, and its own color scheme. Solid wood is used on the worktops of the desks.
We greatly value this construction because we were able to finalize it, including the furnishings, and we are still in contact with the owners.
Zábran Nová architekti
The English translation is powered by AI tool. Switch to Czech to view the original text source.
5 comments
add comment
Subject
Author
Date
...Hm,...
šakal
28.02.17 09:52
...
Daniel John
28.02.17 10:12
Moc dobrý
Luboš
02.03.17 08:56
Nadčasové a solidní
Ivana
02.03.17 02:26
Osazení oken v úrovni stropů
Radek Prokop
20.09.17 10:57
show all comments

more buildings from Zábran Nová architekti